All user roles with the "Manage Integrations" permission have the ability to manage the Primavera P6 integration. Those user roles are:
- Full Access
- Project Admin
- Contract Admin
All user roles with the "Manage Integrations" permission have the ability to manage the Primavera P6 integration. Those user roles are:
Comments
0 comments
Please sign in to leave a comment.