Who can manage the Primavera P6 integration?

All user roles with the "Manage Integrations" permission have the ability to manage the Primavera P6 integration. Those user roles are:

  • Full Access
  • Project Admin
  • Contract Admin
manage integrations snip 1.gif
Was this article helpful?
0 out of 0 found this helpful